Last push on the NSR spindles, i hope!

Hope to have them finished today, a slight lunch, not too many pots of tea and a quiet phone and its possible. Should have the spindles done by lunch time, then 5 bolts to make, race spec, so they’ll have recessed heads drilled for lock wire. Always fun trying to drill a 1.5mm hole in titanium! at least the race spec heads are drilled across the flats rather than across the points, across the points is a horrible job to do. I don’t have a chevron jig so i have to do it in angular stages using the indexing head on the milling machine.

i’ll just finish my coffee…….

Leave a Reply